My Uncle Jim was in town last night and he made some comment about how he wishes he was staying for a few days so he could help me with demo and tiling. Thanks, Jim! If the tiling doesn't work out the first time I may just fly you down to SF to help me redo it.
I intend to start demoing on 12/27 and hopefully start laying tile on 12/28. Before that, though, I need to procure or borrow tools for demo, tiling, replacing the medicine cabinet, removing the toilet and sink, replacing the sink and tub faucets, and other things I'm sure I have not thought of yet.
A few other things to think about:
- What color do I paint the walls and ceiling?
- I want to replace the door but my longer term thought is to put in a sliding door or pocket door. Is it worth buying a new door (the current door is literally falling off its hinges) in the mean time or do I push getting the sliding door in sooner than later?
- What about a soap dish? Should I build one into the tile around the tub?
No comments:
Post a Comment